
Spanish builder Tapusa abandoned bridge and corridor works in Gran Concepcion, leaving more than 50 local firms owed roughly CLP 3 billion (about US$3.3 million). The post A Spanish Builder Walked Off Chile’s Bridges and Left 50 Small…
View original source — Rio Times ↗


