
KATHMANDU — When the flash flood tore through the Bhotekoshi corridor on August 26, it hit a road that had already been taken once. The stretch connecting Syaphrubesi to the Rasuwagadhi border crossing was rebuilt and reopened about a…
View original source — Philippine Daily Inquirer ↗