
Kathmandu, September 8 Search efforts for people missing after the Bhotekoshi-Trishuli floods have intensified at the 37 MW Upper Trishuli-3 B Hydropower Project following the arrival of three large excavators and a backhoe loader. Of the…
View original source — OnlineKhabar ↗



