Wayne Brown critical of ‘gold-plated’ Penlink delays and cost blowout
Slips have forced delays and redesign work to the key 535m-long bridge over the Wēiti River as part of the Penlink highway construction in the long awaited link to Auckland’s Whangaparāoa Peninsula.